CDLE banner image
 
MenuTemplate
A REMINDER TO ALL OWNERS AND CONSULTANTS OPERATING OR PLANNING A REMEDIATION INVOLVING UNDERGROUND INJECTION OF LIQUIDS:

If you are injecting ANY liquids or liquid mixtures (ORC, microbes, nutrients, treated water, etc.)  into the ground, you must provide OPS with a copy of  your Underground Injection Control (UIC) permit.  These permits are obtained from the EPA Region 8 office in Denver (303) 312-6312.  

UIC Program Information    

Note: If you are extracting groundwater and a permit is required to discharge or dispose.  You must provide OPS with a copy of the permit.

You may submit the copy (ies) of the permit(s) with your Corrective Action Plan (CAP) or with our CAP Implementation Report.

All Applicable Rights Reserved, Copyright 2004 Colorado Department of Labor and Employment