CDLE banner image
 
MenuTemplate
Maximum Reasonable Costs - Groundwater Sampling

Article 4, Part 4


4-4-1. RATE PER WELL SAMPLED
$116.00 per well. This includes all labor and materials (bailer, non-disposable bailer, water-level indicator). It does not include analytical testing or disposal of purge water. No additional consultant labor will be reimbursed.

4-4-49. CONSULTANT LABOR AND FIELD INSTRUMENTATION
No additional on-site consultant labor will be reimbursed. Field instruments may be billed separately.

4-4-50. MISCELLANEOUS FIELD SUPPLIES
$22/day/site. This includes such items as gloves, baggies, ice, water, rope, pens, etc. No receipts are required.

All Applicable Rights Reserved, Copyright 2004 Colorado Department of Labor and Employment